10-28-2009, 10:41 PM 
		
	
	
		I'm having a mental block with Q S.22 ( spanning tree sim). if host A needs to contact Server 1 and given the information in the topology - surely the link between Switch D & Switch A would be up?
Without link costs there are multiple permutations - am I missing something from this question.....
Either A-D or C-D could be blocked, likewise A-B or B-C could be blocked..
please convince me A-E-C-D is the correct answer ???
thanks in advance
	
	
	
	
Without link costs there are multiple permutations - am I missing something from this question.....
Either A-D or C-D could be blocked, likewise A-B or B-C could be blocked..
please convince me A-E-C-D is the correct answer ???
thanks in advance

 
